- Company Profile
- About Green Leaf
Jiangsu Green Leaf Boiler Co., Ltd., founded in 1954, is one of the earliest Chinese enterprises that engage in the manufacturing of utility boilers. Ourmain products include utility boiler, gas turbine heat recovery boiler, and pressure vessel. Our company has a building area of 150,000 square meters out of a total floor space of 400,000 square meters and has approx. 1,000 employees. Up to now, Green Leaf has won many honorary titles such as high-tech enterprise of Jiangsu, famous trademark of Jiangsu, famous-brand product of Jiangsu, Jiangsu Research Center for Utility Boiler Engineering Technology, workers vanguard of Jiangsu, private technological enterprise of Jiangsu, and national enterprise with AAA-level standard good behavior.
Our company commits to manufacturing and regards becoming a highland for manufacturing boiler for the world as our development strategy. We also engage in realizing a strong base orientation, intelligentization, and globalization and in producing superior boilers and clean energy for the public. All the Green Leaf people are grateful to the users, the employees and the society. Now Green Leaf is marching forward toward a brilliant future.
-
400000
㎡Covers an area of 400000㎡
-
69
+69 years of industry experience
-
200000
㎡Construction area200000㎡
-
1000
+Nearly 1,000 employees
- Enterprise Culture
- About Green Leaf
Corporate spirit
shoulder responsibilities
and be grateful
Corporate principle
meet customer needs and create value for customers
Corporate objective
pursuit of excellence and
take the lead in the industry
Corporate style
profession, dedication,
and professionalism
- Qualification Certification
- About Green Leaf
- Honor
- About Green Leaf
High-tech enterprise crifiate
The workers vanguard
Engineering and technology
Academician workstation
Famous brand products
- Development History
- About Green Leaf
-
in 1954
- Our company was formerly known as Danyang Huangtang
Tiemuzhu Agency which was founded
- Our company was formerly known as Danyang Huangtang
-
In 1962
- In 1962, Danyang Huangtang Agricultural Implements
Repair Factory was founded.
- In 1962, Danyang Huangtang Agricultural Implements
From 1954 to 1969
basic construction
period
-
In 1970
- our company gradually changed from manual operation to
semi-mechanization,and has expanded forging, casting, and metal
processing. We have produced various practical water pumps (irrigators).
Our company was renamed as Danyang Water Pump Factory and our workers
increased to over 100 and annual production value
amounted to more than 500,000 Yuan.
- our company gradually changed from manual operation to
-
In 1971
- Danyang Utility Boiler Accessories Factory was founded.
In the 1980s, our company was repositioned and established Danyang
Utility Boiler Accessories Factory which engaged in the production of
accessories for industrial boilers. Our factory became partners of the boiler
factory in Wuxi and Shanghai successively. At that time, our
factory expanded production scale and purchased new devices.
- Danyang Utility Boiler Accessories Factory was founded.
-
In 1986 and 1987
- our annual production value was doubled continuously
and amounted to over 3 million Yuan. At the same time, we had more than
300 employees and became the key enterprise of Tanghuang Town.
- our annual production value was doubled continuously
From 1970 to 1993
transition period
-
In 1994
- In 1994, our company took the lead in carrying out reform
and recombination in Danyang, and turned from a collectively-owned
enterprise to a private enterprise. We also succeeded in producing
pressure-containing members for 10t/h - 75 t/h industrial boilers,
and we could turn out 300 tons of products every year.
- In 1994, our company took the lead in carrying out reform
-
In 1998
- we obtained the Production License for Level-B Boiler Pressure-Containing
Member as issued by Jiangsu Provincial Labor Department.
- we obtained the Production License for Level-B Boiler Pressure-Containing
-
In 1999
- it was the 45th anniversary of our factory. Our factory was renamed as
Jiangsu Green Leaf Environmental Industry Co., Ltd.
- it was the 45th anniversary of our factory. Our factory was renamed as
-
In 2000
- our company obtained the ISO9002:1994 quality management system
certification and set about making joint effort with the research
and development institutions in Beijing to produce fume gas
desulfuration equipment. The product enjoyed a ready sale in Shanghai,
Shandong, Inner Mongolia, Jiangsu and other provinces, cities
and autonomous regions.
- our company obtained the ISO9002:1994 quality management system
-
In 2001
- our company entered into cooperation with Shanghai Boiler and
Guangdong Boiler, and we came to turn out products from industrial
boiler components to utility boiler components. Our production
value of 2001 was doubled to over 20 million Yuan.
- our company entered into cooperation with Shanghai Boiler and
From 1994 to 2001
reform and development period
-
In 2002
- our original factory was expanded and put into operation. We
also obtained the level-A boiler (except boiler barrel) as issued by
the State Administration for Quality Supervision
and Inspection and Quarantine.
- our original factory was expanded and put into operation. We
-
In 2003
- we had a merger with Danyang Huangtang Steel Mill. The Pipe Workshop
of Factory No. 2 had been constructed and put into operation.
- we had a merger with Danyang Huangtang Steel Mill. The Pipe Workshop
-
In 2004
- it was the 50th anniversary of our factory which was renamed as Jiangsu
Green Leaf Boiler Accessories Co., Ltd. A new round of
pioneering and development was started.
- it was the 50th anniversary of our factory which was renamed as Jiangsu
-
In 2005
- we had a merger with Danyang Hangtuang Xielian Power Plant.
To make more input for technical reform, we invested a total of
approx. 50 million Yuan to build a new standard workshop of 25,000
square meters. Besides, we introduced another two automatic
assembly lines for pipes which enable us to process 25,000 tons
of pipes annually. At the same time, we obtained the
ASME“S” steel seal of the US.
- we had a merger with Danyang Hangtuang Xielian Power Plant.
-
In 2006
- we obtained the US ASME“S” steel seal certification for
three factories. The new workshop of the third workshop was expanded in
a full scale and put into operation. Besides,
we obtained the production license for grade-A boiler.
- we obtained the US ASME“S” steel seal certification for
-
In 2009
- it was the 55th anniversary of our factory which was renamed
as Jiangsu Green Leaf Boiler Co., Ltd. We also cooperated with the
Institute of Thermal Power Engineering of Zhejiang University
for the research and production of hydraulic soot blower.
- it was the 55th anniversary of our factory which was renamed
-
In March 2010
- we obtained the manufacturing license for pressure vessel A1
high pressure vessel (single layer only) and level-A2 type-III
medium pressure vessel, and obtained the US ASME“U” steel seal.
- we obtained the manufacturing license for pressure vessel A1
-
In August 2010
- construction for heavy volume workshop was started. In 2011,
construction for the heavy volume workshop was completed and the
workshop was put into operation.
- construction for heavy volume workshop was started. In 2011,
From 2002 to 2011
a decade’s rapid development
-
In 2012
- our certification for quality, occupational health and safety
and environmental system passed the examination and the certificates
were renewed. We also approved as the high-tech enterprise
of Jiangsu.
- our certification for quality, occupational health and safety
-
In 2013
- Green Leaf and Green Leaf Boiler was rated as famous trademark
of Jiangsu and famous-brand product of Jiangsu.
- Green Leaf and Green Leaf Boiler was rated as famous trademark
-
In 2014
- our company made active efforts in obtaining the CE certification. After
cooperating with transnational enterprise Hanwha, Alto, and
Mengdong, we cooperated with the Turkey project once again. -
In 2016
- The new plant of 27,000 square meters was completed and
put into production. It was used in the production and manufacture of the
waste heat boiler module of HRSG gas turbine
- The new plant of 27,000 square meters was completed and
-
In 2017
- we set up the Danyang Enterprise Academician Workstation.
The Green Leaf manufacturing base of Shanghai Boiler Factory
was founded.
- we set up the Danyang Enterprise Academician Workstation.
-
In 2018
-
Complete the pressure vessel certificate renewal work
Design capability improvement from model diagram to DD diagram
Complete Jordan ATTART's first oil shale boiler project with quality and quantity guaranteed
Smooth production of digital workshop
Sign a strategic cooperation agreement with SFW
Sign a contract for the UFIDA U9 project
We have produced and manufactured the largest 130MW unit in the world, repeatedly
-
Complete the pressure vessel certificate renewal work
-
In 2019
-
65th anniversary of the company's establishment
Obtained the qualification of Welding Examination Committee through
the review of Jiangsu Special Inspection Institute
Approved by the Jiangsu Provincial Ministry of Industryand Information
Technology for the integration of industrialization and information technology
We have produced the world's first 1350MW unit piping product for high and
low level secondary reheat ultra supercritical units,
Improved the manufacturing capability of the main componentsof the
company's boiler products
Completed the manufacturing of core components in the entireboiler,
including T91 membrane wall, cyclone separator
TP347HFG tube bank, INTRX SUPERHEATER, achieving the
manufacturing of the entire boiler
Established a cost control center, completed the construction
of project management processes
We have built an information management and control platform using U9 as the
carrier, and have done a good job in institutional design for strong
control and high efficiency
Engineering design starts from DD → factory drawings → BD → DD
-
65th anniversary of the company's establishment
-
In 2020
-
Passed the certification renewal of ISO9001 quality, ISO14001 occupational health,
and ISO45001 environmental safety systems in October
In November, the first Green Leaf APP was developed, equipped with an
information feedback system
December Zhenjiang Talent Work Service Station
-
Passed the certification renewal of ISO9001 quality, ISO14001 occupational health,
-
In 2021
- Awarded as the "Most Reliable Partner" by SFW
In 2012
significant development for the future
- Smart Workshop
- About Green Leaf
Intelligent workshop gantry welding
Intelligent workshop pipe system automatic line
Intelligent workshop welding in rows
- Product Center
- Coiler
- Water wall
- Header products
- Heat recovery boiler
- Pressure vessel
- News Center
- Information
- Manufacturing
- Production equipment
- Testing equipment
- Manufacturing scene
Contact Us
Tel:+86 (0)511 86637666
E-mail:marketing@jslygl.com
Address:Zhenjiang Distrit , Jiangsu Province
Pay attention to our